Though the Railways is yet to declare any five-year action plan, it is clear the government is not in a position to hand-hold it for any major expansion or upgrade. The issue, however, is how far the Railways can function within the PPP format. Recent history highlights some of the challenges.
More than half of the total subsidy provisioning, amounting to 54 per cent, is going towards food subsidy, which is estimated at Rs 184,220 crore for 2019-20 - a 7.5 per cent increase over the revised estimates for 2018-19.
Long-term funding was a requirement for infrastructure projects, and asset-liability mismatch in the banking system, impacts the access to finance for infrastructure projects. One of the key challenges would, however, be to get private sector back into investing.
India has achieved 100 per cent electrical connectivity, but 100 per cent electrification remains a long-drawn task, says Shreya Jai.
'A sum of Rs 6,000 a year is very significant for a small farmer whose land holding is very small and whose produce is very small. All these calculations on a daily basis are extremely unfortunate and an insult to farmers.'
Earlier bidders in the SHAKTI auction were finding it difficult to meet their PPA obligations owing to shortfall in coal supply. The industry lobby has urged the Centre to review the guidelines and allow former participants as well.
There are allegations that the Congress-ruled Chhattisgarh govt is putting pressure on South Eastern Coalfields to not renew the contract with Sainik Mining whose promoter Rudra Sen Sindhu is the son-in-law of the late Sahib Singh Varma, a BJP leader and former chief minister of Delhi.
It is developing ash parks at Varanasi, Raipur, Pune and Cuttack, to make it available to ash-based product manufacturing units at these centres. It recently signed an agreement with NHAI for supply of ash for use in road construction.
Son's offer to supply free power after 25 years is based on the idea that the cost of running a solar plant would progressively decline while its efficiency would increase.
The reason for digital and IT interventions increasingly being adopted is not just the change in ways commuters move but also the mode on which this transport moves, says Jyoti Mukul.
Sources said Adani had not been able to tie up any financing for the coal project
While consumers will be paying a higher upfront cost for smart metering, the share in the efficiency gains could more than offset this higher spend
The ICICI board is looking to the retired petroleum secretary to provide 'maturity and sagacity'.
The highest cap for the capacity would be 2 GW and can be set up in tranches at whatever location the project developer deems fit.
The move comes at a time when IL&FS Energy has joined hands with SB Energy
Of the 170 million rural households in the country, a government website claims to have connected 82 per cent of them. The metered households are 50 per cent of the total. As on February, 2018, of the 780,000 villages to be intensively electrified or provide connection to all in households, 493,000 have been covered. However, the amount and quality of the power supply cannot be ascertained from this data. No clause in any of the rural electrification programmes promises 24 hours' power supply.
India will be the global host this year for World Environment Day, with the theme "Beat Plastic Pollution".
A realistic approach towards tax and stock taking is necessary, rather than the old narrative of bringing all petroleum products under GST and playing the blame-the-state game.
Can welfare schemes truly transform from being flagship to flag-bearers for a government that is looking to get a second term in 2019?
Northern and western states had the highest power demand, with Uttar Pradesh sourcing 19,082 Mw, Delhi 6,029 Mw, Rajasthan 10,395 Mw, Gujarat 16,825 Mw, and Maharashtra 23,609 Mw.